Melt Furnace Capacities

Historically, parts producers have focused on dryer and melt furnace capacities as the rate limiting factor when sizing their system. The practical reality, when sizing a system, is that vent stream emissions may be the real rate limiting factor controlling your overall recovery system’s capacity.

One of the first steps when evaluating a potential metals recovery project should be to understand the expected fluids and contaminants in the feed-stock. Given these input conditions, a concurrent analysis of the thermal processing load for the drying system and the expected constituents in the vent stream can be conducted. From these calculations, an estimate of the projected emissions loading from the operation can be determined.


Based on the findings from the above emissions calculations, the appropriate air pollution control system can be sized.  While thermal oxidation of these vents streams is a proven solution to mitigate the VOC emissions from these sources, many lessons have been learned on these specific applications through the years that allow for the optimization of these systems.

Dealing with particulate matter on the inlet, avoiding formation of HAPs at the discharge of the unit, and withstanding the abrasive atmosphere within system, are all challenges which have been successfully overcome.

However, despite these system application improvements, even the most efficient drying system will produce some level of particulate matter emissions. Choosing a design which limits that potential will reduce the demand on the downstream PM removal system and reduce any subsequent loading on the downstream thermal oxidizer. Within the Thermal Oxidizer itself, burner placement/orientation, combustion chamber configuration and the design of primary and secondary heat exchangers will all contribute to a system which can operate in the face of the particulate matter loading, one can realistically expect to see during standard operation.


Understanding rate limiting factors when sizing your secondary aluminum recovery system

Driven by new regulations as well as consumer performance requirements, there has been a global increase in demand for a broad range of cast, extruded and machined aluminum parts. Aluminum parts producers are looking to metals recovery systems to control costs of primary and secondary aluminum purchases and to mitigate their operating cost by capturing value from byproducts.

Understanding the true rate limiting factors when configuring and sizing a metals recovery system is critical to realizing the full potential of the system. Additionally, managing energy within the system will have a large impact on the operating cost and uptime/maintainability of the system.

Comments

Popular posts from this blog

Q1 2023: CEO Business Insider

Business Outlook & CEO Insights

Epcon Industrial Systems LP - Trusted Environmental Solutions